当前位置: News > Technical News > The leakage of the sealing ring will endanger the normal operation of the chiller < 返回列表

The leakage of the sealing ring will endanger the normal operation of the chiller

发布时间:2020-10-06 10:05:00 浏览:2次 责任编辑:Guangdong Jecicool Refrigeration Machinery Co.,Ltd

  In the process of actual use of chillers, many companies operating air-cooled chillers attach great importance to whether the sealing ring of the equipment falls off. If the sealing of the equipment is dangerous, it will threaten the normal operation of the equipment, and even cause many companies to operate the chiller for a longer time, the more losses the company will incur, which is not conducive to the long-term uninterrupted use of the chiller.

  If the equipment can otherwise operate normally, it is necessary to consider whether the operating environment of the chiller meets the requirements of the enterprise. If there are many unfavorable factors in the equipment operating environment, even if the equipment can operate stably, the energy consumption of the equipment will continue to increase. Continuing to use the chiller under the premise of increasing energy consumption will only affect the cost of the company's use of the chiller, and even lead to the longer the company uses the chiller, the more operating expenses the company will incur.

  When a company uses a chiller, serious problems with the sealing ring of the equipment will affect the normal use of the chiller. Because many companies did not conduct serious analysis of the running data before using the chiller, many common glitches appeared. In fact, the harm of small faults is not great. As long as companies can find them in time and deal with them quickly and effectively, they can prevent equipment from being affected by various small faults and increasing energy consumption.

  As the main equipment for enterprises to reduce the temperature of the space, if the chiller has a sealing ring problem during the operation, the longer the equipment runs, the higher the probability of the enterprise's failure. When the enterprise cannot afford the energy consumed by the equipment operation, the enterprise must adjust the appropriate operation plan in time. Only by reducing the operating pressure of the chiller can the equipment operate stably for a long time and avoid any minor failures of the chiller.

  There are many knowledge points that companies need to master when using chillers. If the company is not aware of the hazards of leakage failure of the sealing ring during the operation of the equipment, then no matter how long the company runs the chiller, the safety and stability of the equipment will Was severely affected. Only when enterprises are aware of the importance of the sealing ring and regularly check the sealing ring of the chiller can they ensure the continuous operation of the equipment with a lower failure rate and effectively reduce the energy consumption of the company using the chiller.